Ankeny Regional Airport
Runway Construction
IKV — Ankeny, Iowa
Spring – Fall 2026
FAA Part 107 Licensed • 14 CFR 107.41 Airspace Authorization • Cert. #2026-P107-CSA-08723
Session 09
July 10, 2026
Concrete paving happening along Rwy 18/36. Four 25-foot-wide concrete strips will make up the runway.
⌄
Session 05
May 15, 2026
Concrete pour at the runway 18/36 × 4/22 intersection — earthwork and grading continuing on Runway 18/36
⌄